GE Vernova Power Conversion Retrofit / Upgrade / Repower
Onshore wind Repower
Repower aging 1MW wind turbines to extend lifespan up to 20 years and improve AEP up to 25%. Learn how GE Vernova retrofits legacy turbines.
Description
About
What is Repower?
Repower enhances older turbines by replacing the drivetrains and rotors with upgraded components and the latest controls technology. GE Vernova estimates that approximately 10,500 legacy turbines in the United States alone are eligible for Repower. This could potentially add as much as 2.6 GW more capacity to the grid.
Extended operating life
Repower can extend the life of your equipment up to an additional 20 years.
Increased energy production
Repower can improve Annual Energy Production (AEP) up to 35%.
Improved availability
Repower upgrades update equipment that can significantly improve turbine availability.
Repower solutions
Products tailored to improve your existing wind farm
1.6 MW-97m Repower
Provides new, upgraded drivetrain and extended rotors
The 1.6 MW-97m is our Repower solution for 1.5 MW-77m, 1.6 MW-82.5m, and 1.6 MW-87m turbines. It upgrades the drivetrain and rotor for a more reliable, proven product solution with high availability and reliability.
1.9 MW-127m Repower
Utilizes the same machine head and rotor as the US-leading GE Vernova 2.8 MW-127m turbine.
The 1.9 MW-127m is our Repower solution for the 1.6 MW-100, 1.7 MW-100m, and 1.7 MW-103m turbines. Using equipment from the workhorse 2.8 MW-127m turbine, GE Vernova provides a full machine head, rotor, and downtower assembly (DTA) replacement to help improve AEP by as much as 20%.
Flexible, customized
Wind services
Help avoid potential downtime and system underperformance with GE Vernova’s wind farm services–available to help simplify fleet operations and maintain superior performance.
Contact us
Ready to Repower your wind turbines?
Specifications
| Name plate | 1.6 MW |
|---|---|
| Rotor diameter (m) | 97 |
| Frequency (Hz) | 60 |
| Hub height (m) | 80 100 |
More from GE Vernova Power Conversion
- GE Vernova Power Conversion B105 Dual Gas GIS up to 245 kV
- GE Vernova Power Conversion Dead Tank Circuit Breakers
- GE Vernova Power Conversion F35 72.5 kV GIS for Wind Turbines
- GE Vernova Power Conversion Advanced Automation
- GE Vernova Power Conversion Automation and Protection Services
- GE Vernova Power Conversion CEME Testing Laboratory
- GE Vernova Power Conversion CERDA Testing Laboratory
- GE Vernova Power Conversion Circuit Breaker Retrofit
- GE Vernova Power Conversion Consulting Services
- GE Vernova Power Conversion Cyber Security Services
- GE Vernova Power Conversion Engineering And Consulting
- GE Vernova Power Conversion Engineering Services
Featured services
All services →Maintenance / Service Agreement
Let’s talk about reducing lifecycle costs
Our turbocharger technology is designed for low maintenance and low fuel consumption. Accelleron can help you reduce TCO, find out how.
Retrofit / Upgrade / Repower
Level up your Pielstick with targeted retrofits
Ensure the availability and efficiency of your Pielstick engines with the unique OEM and retrofit solutions. Discover our services now!
Similar services